top of page

Highway Networks and Infrastructure

Installation of complete network infrastructure (cables, control cabinets, call-boxes, etc).

Taking as an example the network installed at Fazenda Campo Alto in Araras/SP, Nalli built the primary network with 13.8KV and the secondary network with more than 40 thousand meters of Kanaflex ducts, 4 thousand meters of 12/20KV cables and 120 thousand meters of low voltage cables.

Another example is the structure that provides electricity along the highway at the CCTV and MPV (Variable Message Panel) points, with the installation of 15-meter metallic columns, the placement of cameras and control cabinets, in addition to the fixing and connection of telephones call box.

bottom of page